ABOUT JJ COATINGS

Milestones

Steps to Celebrate

1994 - 95

Established as a Powder Coating Unit

1998 - 99

Converted our Electric Oven to Gas fired oven first of its kind in Coimbatore .Converted the manual Pre-treatment to over Head Hoist Operation.

2003 -04

We were the first in Coimbatore to convert the Pre-treatment line to a Hot Degreasing & Hot Phosphating with counter flow rinse system.

2006 - 07

We commissioned the first 100 % Lead free E-Coating Plant in Coimbatore.

2007 - 08

We have converted the exhaust E-coat plant to a fully automatic line with converted oven PLC Control SCADA Operating Plant and shift to a new state of the art facility – 17500 SQ FTWe have converted the exhaust E-coat plant to a fully automatic line with converted oven PLC Control SCADA Operating Plant and shift to a new state of the art facility – 17500 SQ FT.

2008 - 09

Installation of Effluent Treatment Plant, Ultra Filtration and RO Plant to recycle our water and make us 100% Recycling & Zero Discharge Unit. We also have DM, Degasser and MB Plant to take care of our Water Treatment requirements.

2012 - 13

We converted our E-Coating Transporters to a blue tooth connected (Wireless) PLC control SCADA operating systems.

2013 - 14

Expanded our built up area to 35,000 SQ FT and Installed a State of the art CNC Machine shop equipped with 5 axis 5 side Machining centers and HMC’s.

2015 - 16

Installation of Painting Booth for LIQUID PAINTING AND RILSAN COATING.

2020 - 21

Installation PLC Controlled Fully Automatic Comveryruzed Fluidized Fusion Bonded Epoxy Powder Coating facility. Installation of Industrial Cleaning Centre with SHOT BLASTING & SAND BLASTING facility.